Additional Powermanager Procedures

Select any of the procedures for additional information on Powermanager reports.

Prerequisites

Configure the Standard Report

Configure the Absolute Energy Report

Configure the Cost Center Report

Configure the Load Duration Report

Configure the Load Variance Report

Configure the Top 10 Energy Report

Configure the Total Energy Report

Configure the Energy Analysis Report

Configure the Power Peak Report

Configure the Delimitation Report

Configure the Sankey Report

Configure the EN 50160 Report

Configure the IEEE 519 Report

Stop the Communication

Monitor an Area and Sector

Create New Report Folder

Edit a Report Definition or a Report Folder

Delete a Report Definition or a Report Folder

Monitor Trends

Load Secondary Pane

Edit Reports Manually

View Manually Corrected Reports